Week 2 continues~
Friday, 28 October 2011 |23:52

This week has been a "layout" week for me~ As the whole week, I'm pretty much occupied with doing up the layout for the environment, alining all the necessary furniture at the appropriate places.


Layout for the:
1. New living room with the necessary furniture
2. Old living room with the necessary furniture
3. Scene where Aden, the male figurine fell


New Living Room

New Living Room [Edited with vase + vase table modified]

Old living room

Old Living Room [Edited with vase + vase table modified]

Some modifications to be taken note of: 
1. Wall prints
2. Fireplace's texture





With loves,
Angie




Week 1 begins once again! ☆
Friday, 21 October 2011 |02:32

For the whole of this week, I spent 4/5 of the time to model, uv-map & texture the sheep which will be a creative idea for replacement of birds which normally come out of the cuckoo clocks when the time strikes a certain timing. Other than that, 1/5 of the time is spent on texturing the looped sofa's dirty version. Furthermore, today, our FYP supervisor, Jim has added on telling us the importance about consistency in everything we do, so that when one task is completed, the other group member would be able to open up the folder with no errors. At the end of the day, a new task was given on Friday: Texturing the original and dirty version of the ceiling wall.


UV-Mapping

Different Views of the sheep modelled

Different Views of the sheep textured




 Front view 

 Perspective view 

Side View

Top View
Regular Ceiling

Dirty Ceiling








With loves,
Angie☆




Work in Progress even during Holidays!!☆
Monday, 17 October 2011 |08:39

☆ It's been two months since this blog has been updated. But no worries, this blog will still  be updated till the end of year 3 where fyp♥ would come to an end.

Work continues for the poppedcorns even during the holidays where everyone would be busy doing part-time jobs, having camps or vice versa! As usual, our team leader, Vanessa, would divide the jobs for each one of us. After which, we will get them done as soon as possible before the next task is given. The routine goes on as usual even back at home! For now, the poppedcorns are working mostly on the modeling & texturing of remaining objects. Once Tina has completed both Hazel & Aden's rigs, we will be able to start on the animation.

 Things I've done:
♪ Texturing of regular staircase - 25th Aug
♪ Texturing of regular windows - 29th Aug
♪ Texturing of regular & dirty floor - 29th Aug
♪ Modeling & Texuring of different regular photoframes - 20th Sep
♪ Texturing of dirty coffee table cloth - 3rd Oct

P.S. Dates listed - Last modified. 

Staircase


Windows
To be updated!


Floor

Dirty Floor


Photoframes
#01

#02

#03

#04


Dirty Coffee Table Cloth








Details of more work will be updated at the end of this week.







With loves,
Angie★





A R T I S T ☆
About Me
Angie Lim★
S10078098H
NP Year 3 Student
9TEEN, 08.07
Diploma in Multimedia and Animation
angie_momo@live.com.sg


R O L E S ☆
Responsibility
Storyboard Artist
Compositor


F E E D B A C K S ☆
Comments
To be updated!






A F F I L A T E S ☆
Popped Corn Productions

Group Blog
Jerry
Jessica
Kalai
Tina
Vanessa


A R C H I V E S ☆
Past Work
October 2011 November 2011 December 2011 January 2012


C R E D I T S ☆
THANK YOU
Basecode | froodlecake
Images | Shabby Princess